Extron electronics IP LINK IPL T PCS4 User Manual page 37

Ip link power control interfaces
Table of Contents

Advertisement

Scheduling power to receptacles
The Schedule screen on the
receptacles is turned on and off. You can schedule receptacles individually to turn on or
off at desired times, or you can select a group of receptacles to turn on or off at one time.
Clicking the
Clear Schedule
schedule for a week at a time, or a day at a time.
To access the Schedule screen, click
screen.
Figure 20.
Schedule Screen Showing Fields for Individual Receptacle Scheduling
Scheduling an individual receptacle
To schedule power on and off to an individual receptacle, follow these steps:
1.
Locate the number of the receptacle that you want to schedule, and click
the Power column beside it. A Set Schedule For section opens, displaying the selected
receptacle number, the power selection (
the hour, minute, and
AM
Schedule For section displayed for receptacle 2, with power on at 1:00 pm Monday and
Thursday.)
2.
From the pull-down menus, select the time (hour and minutes and
you want power turned on or off to the selected receptacle.
3.
Select the check boxes for the days of the week you want the receptacle to be turned
on, off, or both at the time you specified.
4.
When finished, click
Set
5.
Repeat steps 1 through 4 for the remaining power schedule setting for the receptacle
you just scheduled, or for other receptacles that you want to schedule.
tab lets you schedule when power to the
Configuration
button deletes all schedules. You may want to set up your
on the side-bar menu on the Configuration
Schedule
On
or
Off
), and menus from which to select
or
. (Figure 20, above, shows the Schedule screen with a Set
PM
to save your settings for that receptacle.
IPL T PCS4 • HTML Configuration and Control
or
in
On
Off
or
) at which
AM
PM
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip link ipl t pcs4i

Table of Contents