Extron electronics IP LINK IPL T PCS4 User Manual page 34

Ip link power control interfaces
Table of Contents

Advertisement

Figure 18.
Switching/Grouping Screen
Switching power to receptacles on and off
To turn power to receptacles on and off:
1.
On the Configuration tab, select
2.
In the Power column, select the
receptacle that you want to switch. If you want to switch a group of receptacles, select
or
for one of the receptacles in that group (see Grouping receptacles, below).
On
Off
3.
Click
Submit
to put your changes into effect.
NOTE:
If you turn power on by pressing the receptacle button on the front panel
while this screen is displayed, the screen does not change to reflect your
actions until you click Refresh.
Grouping receptacles
You may want to group two or more receptacles together to ensure that they are switched
on or off at the same time. You can create up to three groups. To group receptacles:
1.
Locate the number of the first receptacle that you want to group.
2.
In the Group Number column, select the radio button for the group number (
to which you want to assign the receptacle.
3.
Repeat steps 1 and 2 for the rest of the receptacles that you want to group with the first
one.
4.
When you have made all desired grouping selections, click
NOTE:
After receptacles have been grouped, any power selection that you make
for one of the grouped receptacles is also performed on the others in that
group when you click
If you do not want to group a receptacle with any others, select
from the side-bar menu.
Switching/Grouping
or
radio button beside the number of each
On
Off
Submit
.
Submit
IPL T PCS4 • HTML Configuration and Control
1
,
2
, or
3
.
None
for it.
28
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip link ipl t pcs4i

Table of Contents