Rotax 912 Series Maintenance Manual page 365

912/914 series
Hide thumbs Also See for 912 Series:
Table of Contents

Advertisement

Effectivity 914 Series
Edition 1 / Rev. 0
BRP-Rotax
Maintenance Manual
Further shortcomings can only be detected in correlation with
the respective component of the turbo control unit.
■ CAUTION:
The following checks are necessary if the TCU
is to be replaced.
- Inspection of the throttle valve position using the commu-
nication program. See 76-00-00 sec. 3.1.
■ CAUTION:
If this aid is not at your disposal, a trial run of
the engine is required. Engine operation is
only allowed for transfer to the nearest
maintenance facility, where this check has
to be conducted afterwards.
- Test run engine. See the corresponding Maintenance
Manual (Line Maintenance) for the respective engine type,
912 Series or 914 Series.
- When switching on the TCU, observe self test of the servo
motor, see 76-00-00 sec. 3.1.2.7 and the caution lamps,
see 76-00-00 sec. 3.1.2.2.
▲ WARNING: If an inspection reveals irregularities, then the
engine must not be taken in operation until the
cause is found and rectified.
76-00-00
page 33
May 01/2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

914 seriesMmh-912Mmh-914914 ul 3 dcdi912 uls 3 dcdi

Table of Contents