Ups Installation - Eaton Powerware 5125 Installation Manual

Installation guide for ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

UPS Installation

NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur to
your equipment and void your warranty.
To install the UPS:
1.
2.
X-Slot Communication
Ground Bonding Screw
3.
4.
®
EATON Powerware
If you are installing power management software, connect your
computer to the UPS communication port or optional X-Slot
(see Table 10 on page 30). For the communication port, use only
the serial cable supplied in the E33 accessory kit.
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw.
16A, IEC 320-C20
Communication Port
Input Connector
Bay
REPO Port
Battery Connector
Figure 13. UPS Rear View
If an emergency power-off (disconnect) switch is required by local
codes, see the following section, "Remote Emergency Power-off
Installation," to install the REPO switch before powering on the
UPS.
Continue to "Power Connections and Startup" on page 14.
5125 (9910-E33) UPS Installation Guide for IBM
INSTALLATION
IEC 320-C13 Receptacles
IEC 320-C19 Receptacle
®
S
Applications
164201695 Rev 1
®
card
Circuit
Breakers
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 5125 9910-e33

Table of Contents