5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on all rail assemblies.
®
EATON Powerware
5125 (9910-E33) UPS Installation Guide for IBM
Position 10
Position 8
Position 4
Position 2
Figure 6. Rear Rail Screw Positions
Figure 7. Securing the Rear of the Rail
®
S
Applications
INSTALLATION
Second Rail
First Rail
7
164201695 Rev 1