Eaton Powerware 5125 Installation Manual page 17

Installation guide for ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

3.
Connect isolated, normally-open, dry contacts (rated to handle
60 Vdc maximum, 30 Vac RMS maximum, and 20 mA maximum)
across the REPO device to Pin 1 and Pin 2 (see Figure 14).
Use stranded, non-shielded wiring, size 0.75 mm
(18–20 AWG).
NOTE A separate contact must simultaneously cause UPS input AC power to be removed.
4.
Reconnect the REPO connector to the REPO port.
5.
Verify that the externally-connected REPO switch is not activated to
enable power to the UPS output receptacles.
6.
Plug in the UPS and start the UPS by pressing the On button.
7.
Activate the external REPO switch to test the REPO function.
8.
De-activate the external REPO switch and restart the UPS.
®
EATON Powerware
5125 (9910-E33) UPS Installation Guide for IBM
Pin 1
Pin 2
Figure 14. REPO Connector
®
S
Applications
164201695 Rev 1
INSTALLATION
2
2
–0.5 mm
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 5125 9910-e33

Table of Contents