Rack-Mount Setup - Eaton Powerware 5125 Installation Manual

Installation guide for ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

Rack-Mount Setup

The rail kit can be installed in 48-cm (19-inch) racks and needs only 2U of
valuable rack space.
NOTE Mounting rails are required for each individual cabinet and are located in the UPS
and EBM cartons. All hardware is supplied.
NOTE The UPS and any optional cabinets MUST be installed at the bottom of the rack. If
placed in a rack with existing equipment, the rack must be reconfigured to allow the UPS
installation at the bottom of the rack.
Each rail kit requires one (1) of each item in the following list:
S
Left rail assembly (located in the UPS and EBM cartons)
S
Right rail assembly (located in the UPS and EBM cartons)
S
Mounting handles and screws (located in the UPS and EBM cartons)
S
Rail hardware kit (located in the E33 UPS and EBM accessory kits)
To install the rail kit(s):
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 4).
Rear Hold-Down Bracket
Rear
®
EATON Powerware
5125 (9910-E33) UPS Installation Guide for IBM
Assembly Wing Nuts
Figure 4. Adjusting the Rail Depth
®
S
Applications
INSTALLATION
Front
5
164201695 Rev 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 5125 9910-e33

Table of Contents