Eaton Powerware 5125 Installation Manual page 10

Installation guide for ibm applications
Hide thumbs Also See for Powerware 5125:
Table of Contents

Advertisement

INSTALLATION
2.
3.
NOTE Do not tighten the screws until the UPS or EBM is installed.
4.
6
EATON Powerware
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Secure the rail to the front of the rack with two pan-head screws
and one adapter plate. Insert the screws through positions 3 and 4
of the rail (see Figure 5).
Adapter
Plate
Front Rail Pan-Head
Screws
Figure 5. Securing the Front of the Rail
Using two clip nuts and two hex-head screws, attach the rail to the
rear of the rack (see Figure 6 and Figure 7).
The bottom rail uses positions 2 and 4 for the rear hex-head
screws. If you are installing additional rails, place the next rail
4 holes above the last installed screw.
®
5125 (9910-E33) UPS Installation Guide for IBM
Assembly Wing Nuts
Position 4
Position 3
®
S
Applications
164201695 Rev 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 5125 9910-e33

Table of Contents