Section 6: Interface With Base Unit Installation; Example Of An Installation - Uponor Climate Control Zoning System Installation Manual

Radiant heating and cooling systems
Table of Contents

Advertisement

Section 6
Interface with
Base Unit Installation
This section describes the installation of the
Climate Co ˘ntrol Zoning System Interface in
control systems with up to three base units.

Example of an Installation

A system may consist of up to three base
units managed by a single interface.
Uponor Climate Co ˘ ntrol™ Zoning System Installation Guide
Interface
Base unit (possible installation
with three base units
connected to one interface)
17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Climate Control Zoning System and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

T-75C-55I-75

Table of Contents

Save PDF