Applications - Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct vent condensing gas furnace sizes 040o140, series 170
Table of Contents

Advertisement

FRONT
MAX 80°F
M[N 60°F
-->
A05004
Fig, 4_Retum-Air
Temperature
controls
into containers
be%re
touching
ungrounded
objects
7. An ESD service kit (available
fiom commercial
sources)
may
also be used to prevent
ESD damage.
PROPERTY
DAMAGE
Failure
to follow
this caution
may result
in minor
property
damage.
Local codes may require
a drain pan under entire filmace
and
condensate
trap when a condensing
furnace
is used in an attic
application
or over a finished
ceiling.
APPLICATIONS
Step
l--General
Some
assembly
and
modifications
are
required
%r
furnaces
installed
in any of the 4 applications
shown
in Fig. 1. All &ain and
pressure
robes are connected
as shown
in Fig
6 See appropriate
application
instla/ctions
fbr d-lese procedures
Step
2--Upf[ow
Applications
An upflow
furnace
application
is where
t_mnace blowei
is located
below
combustion
and controls
section of f_./rnace, and conditioned
air is discharged
upwards.
CONDENSATE
TRAP LOCATION
(FACTORY-SHIPPED
ORIENTATION)
The condensate
tlap
is flactol-y installed
in the blower
shelf
and
fhctory
connected
for UPFLOW
applications
A factoo-supplied
tube is used to extend the condensate
trap drain
connection
to the
desired
t'urnace
side for field drain
attachment.
See (ondensate
Trap Tubing
(Factory=Shipped
Orientation)
section
fbr drain tube
extension
details.
(See Fig. 5.)
CONDENSATE
TRAP TUBING
(FACTORY-SHIPPED
ORIENTATION)
NOTE:
See Fig. 6 or robe routing
label
on main fi/mace
door to
confirm
location
of these
tubes.
1. Collector
Box Drain, Inducer
Housing
Drain, Relief
Port, and
Pressure
Switch
Tubes.
These robes should be factory
attached
to condensate
trap and
pressure
switch ready for use in UPFLOW
applications.
These
robes
can be identified
by their connection
location
and also
by a color
label
on each robe. These
robes are identified
as
-->
%llows:
collector
box &ain robe (blue label), inducer
hmMng
&ain
robe
(violet
label
or molded),
relief
port
robe
(green
label),
and pressure
switch
robe (pink label)
2, Condensate
Trap Drain
Tube
The condensate
trap drain
connection
must
be extended
for
field attachment
by doing the fbllowing:
a. Detem_ine
location
of field drain connection.
(See Fig. 2 or
6.)
NOTE:
If internal
filter or side Filter/Media
(abinet
is used, &ain
robe should be located
to opposite
side of casing
fiom return duct
attachment
to assist in filter removal.
b. Remove
and discard
casing
drain
hole plug
button
Ii"om
desired
side.
c. Install
&ain
robe coupling
grommet
(factow-supplied
in
loose parts
bag) in selected
casing
hole.
d. Slide
&ain
robe coupling
(fbctory=supplied
in loose parts
bag) through
grommet
ensuring
tong end of coupling
fitces
blower.
e. Cement
2 factory=supplied
1/2-in.
street CPVC
elbows
to
the rigid drain tube connection
on the condensate
trap. (See
Fig.
5.) These
elbows
must
be
cemented
together
and
cemented
to condensate
trap drain connection
NOTE:
Failure
to use CPV(
elbows
may allow &ain to kink and
prevent
draining.
£ Connect
larger
diameter
drain
tube
and
clamp
(factory-
supplied
in loose parts
bag) to condensate
trap and clamp
securely.
g. Route robe to coupling
and cut to appropriate
length.
h. Attach
robe to coupling
and clamp
securely.
CONDENSATE
TRAP
LO(ATION
(ALTERNATE
LPFLOW
ORIENTATION)
An alternate
tocation
fbr d-le condensate
t_ap is the left=hand
side
of casing.
(See Fig
2 and 7)
NOTE:
If the alternate
left°hand
side of casing
location
is used.
the fimtolT°connected
&ain and relief port tubes must be discon-
nected
and modified
for attachment.
See Condensate
Trap Tubing
(Alternate
Upflow
Orientation)
section
for tubing
attachment.
To relocate
condensate
tlap
to the left-hand
side,
perfbm_
the
following:
1. Remove
3 tubes connected
to condensate
trap.
2. Remove
trap ti"om blower
shelf by gently
pushing
tabs inward
and rotating
trap.
3. Install
casing
hole filler
cap (factory=supplied
in loose parts
bag) into blower
shelf hole where
trap was removed.
N
CARBON
MONOXIDE
POISONING
HAZARD
Failure
to £dlow
this warning
could
result in personal
inju W
or death.
Casing
hole filler cap must
be installed
in blower
shelf hole
when
condensate
trap
is relocated
to prevent
combustion
products
being
drawn
in ti'om
appliances
in the equipment
1"OO111.
4. Install
condensate
trap
into
teftohand
side
casing
hole
by
inserting
robe
connection
stubs
through
casing
hole
and
rotating
until tabs snap into locking
position.
5. Fill unused
condensate
trap casing
holes
with
plastic
filler
caps (fi_ctory=supplied
in loose parts
bag)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents