Purge Gas Lines; Sequence Of Operation - Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct vent condensing gas furnace sizes 040o140, series 170
Table of Contents

Advertisement

A99118
Fig. 48--Inducer
Housing
Drain Tube Cap
3. Insert field=supplied
flmnel
into tube.
4. Pour
1 quart
of water
into funnel/robe.
Water
sho_fld run
through
inducer
housing,
overfill
condensate
trap,
and flow
into open field drain.
(See Fig
49.)
5. Remove
flmnel
and robe from
inducer
housing
and replace
&ain connection
cap and clamp.
A99119
Fig. 49--Filling
Condensate
Trap
37
Step
3--Purge
Gas Lines
If not previously
done, purge lines after all connections
have been
made and check tbr leaks.
iiiii_,
1,
_:
iiiiiil,.
FIRE
AND
EXPLOSION
HAZARD
Failure to follow this warning
could result
in a fire, explosion,
personal
it!ire'y, or death.
Never purge a gas line into a combustion
chamber.
Never test
_br gas
leaks
with
an open
flame
Use
a commercially
available
soap solution
made specifically
_br the detection
of
leaks to check
all connections.
Step
4--Sequence
of Operation
F! RNACE
MAY
NOT
OPERATE
Failure
to _bllow this caution
may result
in flu'nace
operation
stopping
and water
pipes fi'eezing
during
cold weather
Furnace
control
must
be grounded
_br proper
operation,
or
control
will
lock
out
Control
is
grounded
d_rough
green yellow
wire
connected
to gas valve
and burner
box
screw.
Using
schematic
diagram,
follow
sequence
of operation
through
di_:_krent modes.
(See Fig. 30.) Read
and follow
wiring
diagram
carefully.
NOTE:
Ifa power
interruption
occurs
during
a call [br heat (W),
the
control
will
start
a 90=second
blower=only
ON period
two
seconds
after power
is restored,
if the thermostat
is still calling
_br
gas heating.
The Amber
status code LED light will flash code
12
during
the
90=second
period,
after which
the LED
will be ON
continuous,
as tong as no faults are detected
After the 90=second
period,
the fl/mace
will respond
to the thermostat
normally.
The blower
door must
be installed
_br power
to be conducted
through
the blower
door
interlock
switch
ILK
to the
furnace
contloi
CPU,
transformer
TRAN,
inducer
motor
IDM,
blower
motor BLWM,
hot=surfitce
igniter
HSI, and gas valve GV.
HEATING
MODE
(See Fig. 27 for thermostat
connections.)
The wall
thermostat
"calls
for heat,"
closing
the
R to W
circuit.
The furnace
control performs
a self=check,
verifies
the
pressure
switch
contacts
PRS are open,
and starts the inducer
motor IDM.
a. Inducer
Prepurge
Period=
As the
inducer
motor
IDM
comes up to speed, the pressure
switch contacts
PRS close
to begin
a 15-second
prepurge
period.
b. Igniter
'_¥arm-[
p- At the end of the prepurge
period,
the
Hot-Surface
igniter
HSI
is energized
for
a
17=second
igniter
warm-up
period.
c. Trial-Nr-Ignition
Sequence-
When
the igniter
warm-up
period
is completed
the
main
gas
valve
relay
contacts
GVR-I
and -2 close to energize
the gas valve GV, the gas
valve
opens,
and 24 vac power
is supplied
for a field-
installed
humidifier
at the HUM
terminal.
The gas valve
GV permits
gas flow to the burners
where
it is ignited
by
the Hot Surfhce
Igniter HSI. Five seconds
after the GVR=I
closes,
a 2-second
flame
period
begins.
The HSI igniter
will remain
energized
until the flame is sensed or until the
2-second
flame proving
period
begins.