Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual page 16

Deluxe 4-way multipoise fixed-capacity direct vent condensing gas furnace sizes 040o140, series 170
Table of Contents

Advertisement

FURNACE
CASBNG
WIDTH
Table 1--OpeNng
Dimensions
(in.)
APPLICATION
FLOOR OPENING
D
24-3/4
19-5/8
PLENUM OPENING
A
B
16
24-1/8
15-7/8
19
15-1/8
19
15-1/2
19
19-1/2
24-1/8
19-3/8
19
18-5/8
19
19
19
23
24-1/8
22-7/8
19
22-1/8
19
22-1/2
19
C
Upflow Applications
16-5/8
Downflow Applications
on Non-Combustible
Flooring
16-1/2
Downflow Applications
on Combustible
Flooring Using
KGASB Subbase
16-3/4
20-3/8
17-112
Furnace with or without CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Downflow Applications on Combustible
Flooring NOT Using
KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or
16-1/2
20
KCAKC Coil Box
Upflow Applications
20-1/8
24-3/4
Downflow AppIications
on Non-Combustible
Flooring
20
1%5/8
Downflow Applications
on Combustible
Flooring Using
KGASB Subbase
20-1/4
20-3/8
21
Furnace with or without CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Downflow Applications on Combustible
Flooring NOT Using
KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or
20
20
KCAKC Coil Box
Upflow Applications
23-5/8
24-3/4
Downflow Applications
on Non-Combustible
Flooring
23-1/2
1%5/8
Downflow Applications
on Combustible
Flooring Using
KGASB Subbase
23-3/4
20-3/8
24-112
Furnace with or without CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Downflow Applications on Combustible
Flooring NOT Using
KGASB Subbase
Furnace with or without CD5 or CK5 Coil Assembly or
23-1/2
20
KCAKC Coil Box
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
/_
COMBUSTIBLE
FLOORING
"k
SHEET METAL ._,.
PLENUM
__
FLOOR
__
OPENING
A96284
Fig. 20--Furnace,
Plenum, and Coil AssemNy
or
Coil Box Installed
on a Combustib{e
Floor
16
[TNIT MAY NOT OPERATE
Failure to %ltow this caution may result in intem_ittent unit
operation.
Do not bend duct flanges inward as shown in Fig 2! This
will affect airflow across heat exchangers and may cause limit
cycling or premature heat exchanger _itilure, Remove duct
flange completely or bend it inward a minimum of 2!0 ° as
shown in Fig, 21
NOTE:
For 140 size unit when installed
in downflow
orientation,
cut the white jumper
wire offbetween
terminals
PL]-7
and PLI=9.
Do not cut white
jumper
between
tem_inals
PLI=7
and PLI-11.
Refer
to Fig.
30 _br location
of jumper
(ut
jumper
close
to
connector
and remove
wire to avoid
a short circuit
Step
a--installation
in Horizontal
Applications
UNIT
MAY
NOT
OPERATE
Failure
to _bltow this caution
may result
in intem_ittent
unit
operation.
The
entire
length
of _i/rnace
MUST
be
supported
when
furnace
is used
in a horizontal
position
to ensure
proper
draining.
When
suspended,
bottom
brace
supports
sides and
center blower
shelf
When unit is supported
fi'om the ground,
blocks
or pad should
support
sides and center
blower
shelf
area.
These
fmnaces
can be installed
horizontally
in either
horizontal
te_ or right discharge
position.
In a crawlspace,
t'm'nace can either
be hung
from
floor
joist
or installed
on suitable
blocks
or pad.
Furnace
can be suspended
flora
each corner
by hanger
bolts
and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents