Location - Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct vent condensing gas furnace sizes 040o140, series 170
Table of Contents

Advertisement

d. (lamp
robe to prevent
any condensate
leakage.
2. Inducer
Housing
Drain
Tube
a Remove
fhctoryoinstalled
cap and
clamp
from
LOWER
inducer
housing
drain connection.
b. Remove
and
discard
UPPER
(molded)
inducer
housing
drain robe which
was previously
connected
to condensate
trap.
c. Install
cap and clamp
on UPPER
inducer
housing
&ain
connection
where
molded
&ain robe was removed.
d. Use inducer
housing
&ain extension
tube (violet
label and
factory-supplied
in loose
parts
bag)
to connect
LOWER
inducer
housing
&ain connection
to condensate
trap.
e. Detem_ine
appropriate
length,
cuL and connect
robe
to
condensate
trap.
f\ Clamp
tube to prevent
any condensate
leakage.
3. Relief
Port Tube
Refer
to
Pressure
Switch
Tubing
section
for
connection
procedure.
(ONDENSATE
TRAP FIELD DRAIN ATTA(HMENT
Refer to Condensate
Drain
section %r recommendations
and
procedures
PRESSURE
SWITCH
TUBING
One collector
box pressure
tube (pink label) is f'_ctory connected
to
the pressnre
switch
fbr use when
furnace
is installed
in UPFLOW
applications
This tube MUST
be disconnected
and used for the
condensate
trap relief port robe. The other collector
box pressnre
robe (green
label) which
was fSctory
connected
to the condensate
trap relief
port
connection
MUST
be connected
to the pressure
switch
in DOWNFLOW
or HORIZONTAL
RIGHT
applications
NOTE:
See Fig. 12 or tube routing
label on main filrnace
door to
check
for proper
connections
Relocate
tubes as described
below
1. Disconnect
collector
box pressure
tube (pink label) attached
to
pressure
switch.
2. Extend
collector
box pressure
tube (green
label)
which
was
previously
connected
to condensate
trap relief porq_connection
by splicing
to small
diameter
robe (factov-supptied
in loose
parts
bag).
3. Route
extended
collector
box pressure
robe behind
inducer
motor
bracket
then
between
inducer
motor
and
pressure
switch,
4. Connect
collector
box pressm'e
tube (green
label) to pressure
switch
connection
labeled
COLLE(TOR
BOX.
5. Use
remaining
smaller
diameter
tube
(gtctoryosupplied
in
loose parts bag)
to extend
collector
box pressure
robe (pink
label) which
was previously
connected
to pressure
switch.
d. Route this extended
robe (pink label) to condensate
trap relief
port connection.
7. Detem_ine
appropriate
length,
cut, and connect
robe.
8. Clamp robe to relief port connection.
(ONDENSATE
TRAP
FREEZE
PROTECTION
Re[kr
to (ondensate
Drain
Protection
section
%r recommendao
tions and procedt/res.
(ONSTRUCT
A WORKING
PLATFORM
Construct
working
platfbm_
where
all required
furnace
clearances
are met. (See Fig
3 and 11)
13
UPFLOW OR DOWNFLOW
V2" MAX
HORIZONTAL
A02146
Fig. 13--Furnace
Location for Proper Condensate
Drainage
UNIT
MAY
NOT
OPERATE
Failure
to [bllow
this caution
may result
in intem_ittent
unit
operation.
The condensate
trap MUST
be installed
below
furnace
See
Fig. 5 for dimensions.
The drain
connection
to condensate
trap must also be properly
sloped
to an open drain.
NOTE:
(ombustionoair
and vent pipes
are restricted
to a mini-
mun_ length
of 5 ft. (See Table
7.)
NOTE:
A 12oin. mininmm
of_;et pipe
section
is recommended
with
short
(5 to 8 ft) vent
systems.
This recomn_endation
is to
reduce
excessive
condensate
droplets
fi'om exiting
the vent pipe.
(See Fig. 11 or 34.)
LOCATION
Step t--General
This furnace must
*
be installed
so the electrical
components
are protected
from
water
not be installed
directly
on any combustible
material
other than
wood
flooring
(refer
to SAFETY
CONSIDERATIONS).
*
be located
so combustion-air
and vent pipe n_aximum
lengths
are not exceeded.
Re[_r to Table
7.
*
be located where
available
electric
power
and gas supplies
meet
specifications
on the furnace
rating
plate.
*
be attached
to an air distribution
system
and be located
as close
to the center of the distribution
system
as possible.
Re['cr to Air
Ducts
section.
*
be provided
with
ample
space
fbr servicing
and
cleaning.
Always
comply
with
nainimun_
fire
protection
clearances
shown
on the furnace
clearance-toocombustibles
label.
This fi_rnace may be located
in a confined
space
without
special
provisions
fbr dilution
or ventilation
air.
When a fm'nace is installed
so that supply/lucts
caro- air circulated
by d_e ftm_ace to areas outside
the space
containing
the f'umace.
the return
air shall
also
be handled
by ducts
sealed
to filrnace
casing.
The
&lcts
terminate
outside
the
space
containing
the
ft_rnace to ensure
there will not be a negative
pressure
condition
within
equipment
room or space.
NOTE:
For upflowidownflow
applications
install
furnace
so that
it is level
or pitched
[brward
within
1i2oin. for proper
furnace
operation.
For horizontal
applications
pitch
1/4-in.
minimtml
to
1i2oin. maxinmnl
forward
to ensure
proper
condensate
&ainage
from
secondary
heat exchangers.
(See Fig. 13.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents