Condensate Drain; Application - Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct vent condensing gas furnace sizes 040o140, series 170
Table of Contents

Advertisement

TaNe 8--Maximum
AItowaNe
Exposed Vent Pipe Length
(ft) With and Without
Insulation
in Winter
Design
Temperature
Ambient*
WINTER
DESIGN
MAX PIPE
FURNACE
W_THOUT
W_TH 3/8-1N. OR
TEMPERATURE
DIAMETER
SRZE
(OF)
(BN.)
INSULATION
THICKER
INSULATIONt
20
1.5
51
70
0
1.5
28
70
-20
1.5
16
70
040
20
2
45
70
0
2
22
70
-20
2
10
58
20
2
65
70
060
0
2
35
70
-20
2
20
70
20
2
55
55
0
2
48
55
-20
2
30
55
080
20
2.5
70
70
0
2.5
47
70
-20
2.5
28
70
20
2.5
40
40
0
2.5
40
40
-20
2.5
38
40
100
20
3
70
70
0
3
50
70
-20
3
28
70
20
3
70
70
0
3
61
70
-20
3
37
70
120
20
4
70
70
0
4
48
70
-20
4
23
70
20
3
60
60
0
3
60
60
-20
3
44
60
140
20
4
70
70
0
4
57
70
-20
4
30
70
* Pipe length (if) specified _r maximum pipe lengths located
unconditioned
as specified
in Table 7.
t
Insulation thickness based on R vNue of 35 per in
spaces. Pipes located in unconditioned
space cannot exceed total allowable
pipe length
[?NIT
MAY
NOT
OPERATE
Failure
to follow
this caution
may result
in intermittent
unit
operation
Unit must
not be installed,
operated,
and then mined
off and
left in an unoccupied
structure
during
cold
weather
when
temperature
drops
to 32cT and below
unless
&ain
trap and
drain
line have
adequate
t'reeze protection.
See Service
and
Maintenance
Instructions
for winterizing
procedure
(See Fig
15.)
Step
10--Condensate
Drain
GENERAL
( ondensate
trap is shipped
installed
in the blower
shelf and factow
connected
for UPFLOW
applications
(ondensate
trap must
be
RELOCATED
for use
in DOWNFLOW
and
HORIZONTAL
applications.
(ondensate
trap MUST
be used for all applications.
An external
trap isnot required
when connecting
the field drain to
this condensate
trap.
34
The field drain connection
(condensate
trap or drain robe coupling)
is sized
for
ti2=in.
CPV(,
li2-in
PV(,
or
5/g-in.
ID
robe
connection.
Drain
pipe
and fittings
must
confbm_
to ANSI
standards
and
ASTM
D1785,
D2466
or D2846.
CPVC
or PVC
cement
must
confc_rm to ASTM
D2564
or F493. Primer
must conform
to ASTM
F656.
In Canada,
use CSA or ULC listed
schedule
40 (PVC
or
PVC
drain pipe, fittings,
and cement.
When
a condensate
pump
is required,
select
a pump
which
is
approved
fbr condensing
Nmace
applications.
To avoid
conden=
sate spillage,
select a pump
with an overflow
switch.
Furnace
condensate
is mildly
acidic,
typically
in the pH range
of
3.2 to 4.5. Due to corrosive
nature
of this condensate,
a condensate
pH neutralizing
filter may be desired.
Check with local authorities
to determine
if a pH neutralizer
is required.
APPLICATION
The furnace,
A/C,
and humidifier
drains
may be combined
and
drained
together.
The AiC
&ain
must
have
an external,
field=
supplied
trap
prior
to the
_ilrnace
&ain
connection.
All &ain
connections
(t:urnace,
Ai(,
or humidifier)
must be temlinated
into
an open
or vented
drain
as close
to the respective
equipment
as
possible
to prevent
siphoning
of the equipment's
drain.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents