AEMC 407 User Manual page 37

Power clamp-on meter
Table of Contents

Advertisement

Conventions:
Load designates the consumed energy by the load (W+)
Load C designates the capacitive reactive energy (W+ and var-)
Load L designates the inductive reactive energy (W+ and var+)
Supp designates the energy generated by the load (W-)
Supp C designates the capacitive reactive energy (W- and var-)
Supp L designates the inductive reactive energy (W- and var+)
7.
To access the screens concerning the energies received by the load
(« Load side »), press the
term "LoAd at the bottom of the screen.
The sequence of use is as follows:
I- Load h W ---> Load L h VAR ---> Load C h VAR ---> Load h VA ---> I
I <----------------------------------------------------------------------------------------- I
Example of « LOAD side » screen
8.
To access the screens concerning the energies generated by the load
and therefore received by the source ("Supply side"), press the
button to view the screens that have the term "SuPP at the bottom
of the screen.
The sequence of use is as follows:
I - Supp h W ---> Supp L h VAR ---> Supp C h VAR ---> Supp h VA ---> I
I <------------------------------------------------------------------------------------------- |
button to view each screen that has the
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

607

Table of Contents