Test Run - Toshiba VN-M150HE Service Manual

Air to air heat exchanger concealed microcomputer control type
Hide thumbs Also See for VN-M150HE:
Table of Contents

Advertisement

12

Test Run

Before performing a test run
• Before turning on the power supply, carry out the following procedure.
Using 500 V-megger, check that resistance of 1 M or more exists between the terminal block of the power
supply and the earth (earthing).
If resistance of less than 1 M is detected, do not run the unit.
• When a test run is performed together with air conditioners, follow the Installation Manuals of the air conditioners.
Performing a test run of the Air to Air Heat Exchanger using the
remote controller (NRC-01HE)
Confirm that the unit operates properly referring to the Owner's Manual of the Air to Air Heat Exchanger.
Operation item
1. Starting operation
2. Changing the
ventilation mode
3. Changing the
ventilation amount
4. Stopping operation
Button
Display
133
Operation
The operation lamp lights up, then the
Air to Air Heat Exchanger starts
running.
Each time the ventilation mode button
is pressed, the mode changes as
follows:
Each time the ventilation amount
button is pressed, the ventilation
amount changes as follows:
*
or
is displayed only
when the imbalanced ventilation
Fan speed is valid.
The operation lamp goes off, then the
Air to Air Heat Exchanger stops
running.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents