1-7-6. SW Guard Assembly
1. Remove the outside panel. (Refer to Section 1-7-1.)
2. Remove the two screws to remove the SW guard
assembly.
n
If the loader has already been moved to the up posi-
tion, the SW guard assembly may be difficult to
remove in some cases. Move down the loader by
rotating the gear in clockwise direction with crosshead
screwdriver.
Installation
Install the removed parts by reversing steps 1 to 2 of
removal.
1-7-7. Shoulder Pad, Connector Cover
1. Loosen the two pad screws, and remove the shoulder
pad.
2. Remove the four screws, and remove the connector
cover.
Note on installation:
After the shoulder pad is reinstalled, check the slide
operation. Check that it slides smoothly with the screws
fastened.
1-38
SW guard
assembly
PSW2 x 5
B3
x
8
B3
x
8
Cross head (+)
screwdriver
Cover
Gear
A
Connector cover
B3
x
8
LW3
Pad screws
Shoulder pad
PDW-700/V1 (E)