Step
1
2
3
4
5
Option 4
Graphic
Fig. 22
Effectivity: 914 Series
Edition 2 / Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Install the vacuum gauge.
Clamp the tube (2) with hose clamping pliers (1). Observe the position! The
compensation tube (3) does not have to be removed.
Unscrew the screw (4).
Install the hose nipple M6 (5) with the sealing ring (6).
After synchronization tighten the screw M6x6 (4) with LOCTITE 221.
3
2
Part
1
Clamping pliers
2
Tube
3
Compensation tube
4
Screw M6x6
5
Hose nipple
6
Sealing ring
Option 4
Procedure
1
5
4
Function
6
08661
12-20-00
page 43
January 01/2010