Fujitsu ETERNUS DX500 S3 Configuration Manual page 81

Disk storage system
Hide thumbs Also See for ETERNUS DX500 S3:
Table of Contents

Advertisement

Chapter 4
Monitoring Settings
4.6
Transmission Test Execution
4
Click the [Send Test E-Mail] button.
5
Check that the test mail is sent to the e-mail addresses that are set.
For details on the event code and message of the test mail, refer to "Message List".
FUJITSU Storage ETERNUS DX500 S3/DX600 S3 Disk storage system Configuration Guide (Basic)
81
Copyright 2014 FUJITSU LIMITED
P3AM-7732-05ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx600 s3

Table of Contents