Verilink DIDCSU 2912 Manual page 39

Dual integrated data service unit/channel service unit
Table of Contents

Advertisement

16. Type "DP", then at the prompt use "1,2" for the shelf/slot
address. At the next prompt type "4" for Data Port 2.
17. Type "SM", and respond "N" if you are asked whether this is an
unframed E1 circuit. Type "1- - - - 15" to specify the timeslots.
18. Type "DM", and respond "N" if you are asked whether this is
an unframed E1 circuit. Type "1- - - - 15" to specify the timeslots.
19. Type "U" to assign the bus. As with the first circuit, no bus is
required because the source and destination ports are on the
same DIDCSU module. The menu returns with the bus set to
INT.
20. Type "S" to setup the circuit. A prompt is displayed indicating
a successful circuit build.
21. Connect the two E1 circuits. Observe that the front panel NET
LEDs turn green within 15 seconds.
22. Connect the Data Terminal Equipment (DTE).
Verilink DIDCSU 2912 User Manual
DIDCSU 2912 Quick Set-Up
2-21

Advertisement

Table of Contents
loading

Table of Contents