E1 Quick Set-Up - Verilink DIDCSU 2912 Manual

Dual integrated data service unit/channel service unit
Table of Contents

Advertisement

E1 Quick Set-Up

16. Type "DP", then at the prompt use "1,2" for the shelf/slot
address. At the next prompt type "4" for Data Port 2.
17. Type "SM", and respond "N" if you are asked whether this is an
unframed T1 circuit. Type "1-12" to specify the timeslots.
18. Type "DM", and respond "N" if you are asked whether this is
an unframed T1 circuit. Type "1-12" to specify the timeslots.
19. Type "U" to assign the bus. As with the first circuit, no bus is
required because the source and destination ports are on the
same DIDCSU module. The menu returns with the bus set to
INT.
20. Type "S" to set up the circuit. A prompt is displayed indicating
a successful circuit build.
21. Connect the two T1 circuits. Observe that the front panel NET
LEDs turn green within 15 seconds.
22. Connect the Data Terminal Equipment (DTE).
This quick configuration guide makes the following assumptions:
• You are installing the DIDCSU 2912 in a dual-line shelf with an
NCM 2000 module .
• You are connecting two E1 facilities—one a fractional E1 using
15 DS0s, the other a full E1 with 30 DS0s—to the two network
ports of the DIDCSU 2912.
• The full E1 connects to Net Port 1 and all of the timeslots are
mapped to Data Port 1, the fractional E1 is connected to Net
Port 2 and the first 15 DS0s are mapped to Data Port 2.
• The NCM 2000 controller module is in slot 1 and the DIDCSU is
in slot 2.
Figure 2-14 Example Configuration
Management
Terminal
Verilink DIDCSU 2912 User Manual
DIDCSU 2912 Quick Set-Up
Fractional
Full E1
E1
30 DS0s
15 DS0s
2-11

Advertisement

Table of Contents
loading

Table of Contents