Cisco Unity Installation Manual page 44

Cisco unity server installation guide
Table of Contents

Advertisement

Installing or
reseating voice and
fax boards
Continued
36
UNITY INSTALLATION GUIDE
d Attach an antistatic wrist strap.
WARNING! Always use an antistatic wrist strap when you
handle boards or other components. Static electricity can
damage the components in computer equipment.
e Set the switches and jumpers on each board. Refer to "Hard-
ware settings" for your voice or fax board in Appendix A.
Some boards include hardware settings that indicate which
board is first, which is second, and so on. If you are install-
ing more than one board of the same model, keep the
boards in order so you can install them in the correct order
in step h.
Do not do the procedures under "Software setup" for
NOTE:
your voice board in Appendix A at this time. The Unity Instal-
lation Guide alerts you when to do the procedures later in the
installation.
f For VoiceBridge 2000 boards, record the serial number of
each VoiceBridge 2000 board and its position relative to the
D/160SC board on the "Voice board worksheet," on
page 68. The serial number is located on a label at the rear
of the board. Keep the boards in the order in which you
write them down on the worksheet.
g Select a slot for each board. For more information, see
"Where to install voice and fax boards in a turnkey system,"
on page 38.
NOTES: PCI boards can be put into either 32-bit or 64-bit PCI
slots.
All ISA boards and all boards with SC or CT bus connectors
must be installed in the same box. If not all boards fit in the
Unity or ActiveFax server, then you must install all of them in
an expansion chassis.
h Insert each board firmly into its slot, and fasten each board
to the computer's backplate with a screw.
If you are installing more than one board of the same model,
and if the boards include a hardware setting that indicates
which board is first, second, and so on, install the boards in
the order specified by the hardware settings.
If you are installing D/160SC and VoiceBridge 2000 boards,
install boards in the order in which they appear on the
"Voice board worksheet," on page 68.

Advertisement

Table of Contents
loading

Table of Contents