Table 6 Rack-mounting procedures at a glance
Chassis
•
5800-48G-PoE+ (2 slots)
•
5800-48G-PoE+ TAA (2 slots)
•
5820X- 1 4XG-SFP+ (2 slots)
•
5820X- 1 4XG-SFP+ TAA (2 slots)
•
5800AF-48G
•
5820AF-24XG
•
All other 5800 switches
•
5820X-24XG-SFP+
•
5820X-24XG-SFP+ TAA
Figure 5 Rack-mounting procedure (1)
Figure 6 Rack-mounting procedure (2)
Figure 7 Rack-mounting procecure (3)
NOTE:
If a rack shelf is available, you can put the switch on the rack shelf, slide the switch to an appropriate
location, and attach the switch to the rack with the mounting brackets.
Procedure
Procedure references
diagram
1.
Attaching the mounting brackets to the chassis (for
all the switches except the
5800AF-48G/5820AF-24XG).
Figure 5
2.
Rack-mounting a 5800/5820X switch except the
5800AF-48G/5820AF-24XG.
Attaching the mounting brackets, chassis rails, and
1.
grounding cable to the chassis
(5800AF-48G/5820AF-24XG).
Figure 6
2.
Rack-mounting a 5800AF-48G/5820AF-24XG
switch.
1.
Attaching the mounting brackets to the chassis (for
all the switches except the
5800AF-48G/5820AF-24XG).
Figure 7
2.
Rack-mounting a 5800/5820X switch except the
5800AF-48G/5820AF-24XG.
9