Concluding Steps; Replacing Double-Width Connection Blades; Required Tools; Preliminary Steps - Fujitsu Primergy BX900 S2 Upgrade And Maintenance Manual

System unit
Hide thumbs Also See for Primergy BX900 S2:
Table of Contents

Advertisement

8.3.2.5

Concluding steps

Perform the following procedures to complete the task:
Ê If applicable, close the rack door as described in section
door" on page
8.3.3

Replacing double-width connection blades

Upgrade and Repair Units (URU)
average hardware task duration: 5 minutes
average software task duration: 10 minutes
8.3.3.1

Required tools

Preliminary and concluding steps: tool-less
Installing connection blades: tool-less
8.3.3.2

Preliminary steps

Before replacing a double-width connection blade, perform the following steps:
Ê If possible, save the connection blade settings as described in section
"Saving connection blade settings" on page
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired system unit as described in section
error class" on page
Ê Locate the defective connection blade as described in section
defective component" on page
Ê If applicable, disconnect cables from the connection blade.
Ê If applicable, remove QSFP transceiver modules from the connection blade
as described in section
page
133.
BX900 S2
60.
48.
45.
48.
"Removing an SFP+ transceiver module" on
Upgrade and Maintenance Manual
Connection blades
"Closing the rack
76.
"Opening the rack
"Determining the
"Locating the
125