Field Replaceable Units (Fru); Average Task Duration - Fujitsu Primergy BX900 S2 Upgrade And Maintenance Manual

System unit
Hide thumbs Also See for Primergy BX900 S2:
Table of Contents

Advertisement

Before you start
2.1.3

Field Replaceable Units (FRU)

Field Replaceable Units (FRU)
Removing and installing Field Replaceable Units involves complex maintenance
procedures on integral system unit components. Procedures will require
shutting down, opening and disassembling the system unit.
V
CAUTION!
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians trained
by Fujitsu. Please note that unauthorized interference with the system
will void the warranty and exempt the manufacturer from all liability.
Components that are handled as Field Replaceable Units
– Local Service Display
– Midplane
– Front docking board
I
Please ask your local Fujitsu service center for more detailed
information.
2.2

Average task duration

Average task duration: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to
table 1 on page 25
calculating the average task duration:
24
for an overview of steps taken into account for
Upgrade and Maintenance Manual
BX900 S2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents