Management Blades
9.2

Installing a second management blade

Field Replaceable Units (FRU)
average hardware task duration: 5 minutes
average software task duration: 10 minutes
9.2.1

Required tools

Preliminary and concluding steps: tool-less
Installing connection blades: tool-less
9.2.2

Preliminary steps

Before installing a management blade, perform the following steps:
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired system unit as described in section
error class" on page
Ê Connect a field service terminal to the installed management blade as
described in section
page
44.
Ê Take a note of the firmware version of the installed management blade as
described in section
on page
66.
9.2.3

Removing the management blade dummy module

Ê Remove the management blade dummy module from the unused
management blade bay.
144
48.
45.
"Accessing the management blade web interface" on
"Looking up the management blade firmware version"
Upgrade and Maintenance Manual
"Opening the rack
"Determining the
BX900 S2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents