Management Blades
Ê Verify the time settings of the new management blade as described in
section
"Verifying the management blade time settings" on page
Ê Disconnect the field service terminal from the management blade.
Ê If applicable, close the rack door as described in section
door" on page
9.4

Replacing the management blade battery

Field Replaceable Units (FRU)
Average task duration: 5 minutes
9.4.1

Required tools

Preliminary and concluding steps: tool-less
Installing connection blades: tool-less
9.4.2

Preliminary steps

Before replacing a management blade, perform the following steps:
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired system unit as described in section
error class" on page
Ê Locate the defective management blade as described in section
the defective component" on page
9.4.3
Replacing the management blade battery
Ê Remove the defective management blade.
148
60.
48.
45.
Upgrade and Maintenance Manual
48.
70.
"Closing the rack
"Opening the rack
"Determining the
"Locating
BX900 S2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents