VKI Technologies Eccellenza cafe Service Manual page 72

Eccellenza cafe
Table of Contents

Advertisement

Eccellenza Café – Service Manual
12. Use tape or wire ties to neatly bundle all three flavor tubes together. If using wire
ties, do not over tighten as this may crush the tubes.
13. Cover the bundle flavor tubes with the convoluted tubing removed earlier.
14. Reinstall the flavor pump cover.
a. Remove the cover from the three screws on which it was placed for servicing
the pumps in step #4.
b. Route the three outlet hoses out though the cutout on the top of the pump
cover.
c. Route the convoluted tubing containing the three inlet hoses in through the
cutout on the right side of the pump cover.
d. Carefully align the pump cover's keyhole slots over its three mounting screws
in the door (two at the top and one at the bottom).
i. Make certain all of the wiring and the flavor tubing are inside
the pump cover and are not getting pinched between the cover
and the door.
72
August 5, 2013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents