4036/2036 Switch Power Up; Figure 38: Securing The Long Bracket Screws To The Mounting Bar; Figure 39: Switch Mounted In A Rack - Rack Front View - Mellanox Technologies Grid Director 4036 Installation Manual

Table of Contents

Advertisement

Grid Director 4036/2036 Installation Manual
Important: This step should be done last.

Figure 38: Securing the long bracket screws to the mounting bar

Result – Rack front view
Figure 39: Switch mounted in a rack – Rack front view
6.6

4036/2036 Switch Power Up

Once the 4036/2036 chassis is secure within the rack, electrical cables from the power
distribution source can be fitted in preparation for connection.
Two power cords are supplied by Mellanox, one per power supply unit.
To power up the 4036/2036 switch:
1. Ensure that all site power requirements have been met before connecting the chassis to a
power source.
2. Before turning on the power, verify that the power supplies and fan tray are properly
inserted.
3. Connect the power supply cords to the AC inlets of the Power Supplies (PSU) located at the
front of the chassis.
4. Connect the other side of the power cords to the PDU.
The PWR LED indicator lights up.