3.4.6.7 COMBUSTION VERIFICATION PROCEDURE:

A. DRILL
A
9/32"
APPROXIMATELY 18" FROM THE OUTLET.
B. CLOSE THE DOOR AND THE AIR INTAKE OF THE WOOD BURNING
FURNACE.
C. LIGHT THE BURNER FOR AT LEAST 10 TO 15 MINUTES.
D. OVER THE FIRE DRAFT = 0.01 TO 0.02 IN.W.C. (THE DRAFT OVER THE
FIRE MUST BE MEASURED IN THE OPENING OF VISION TUBE'S
PULSATION TRAP.)
E. SMOKE TEST BETWEEN 0 AND 1 ON THE SHELL BACHARACH SCALE
(TRACES).
F. DRAFT IN THE CHIMNEY = - 0.02 IN.W.C TO 0.04 IN.W.C.
G. PERCENTAGE OF EXCESS AIR = 20 TO 40 %, 12 % CO
H. AVERAGE EFFICIENCY OF 80 TO 85 %.
I. TIGHTEN ALL THE LOCKING SCREWS AFTER COMPLETING THE FINAL
ADJUSTMENT.
DIAMETER
HOLE
76
IN
THE
EVACUATION
, 4,6 % O
2
PIPE
.
2