Rack; Chassis Removal From Rack - Ametek SPS A Series Operation Manual

Ametek sps a series dc power supplies
Table of Contents

Advertisement

AMREL SPS-A Series

2.3.1 RACK

The SPS-A Series models are designed for mounting in a standard
19-inch equipment rack. If additional instrumentation is mounted in the
rack, no additional clearance is required above or below units in the SPS-
A Series.
1. Support the unit using rack mount slides or appropriate L brackets
(suggested parts are listed below).
Rack Mount Slide Kit:
4–15kW units P/N K550212-01
20–30kW units P/N K550213-01
2. Secure the unit in place using the screws provided.
2.3.2 6U CHASSIS REMOVAL FROM RACK
The slides have a Front Disconnect Feature and lock at full extension.
To return the chassis back into the rack from full extension, depress the
flat steel spring inward (located on the slides) and push the chassis back.
To disconnect and remove the chassis from the rack, depress the flat
steel spring inward (located on the slides) and pull the chassis forward.
WARNING!
A minimum three-person lift is required for the 6U SPS-A Series unit, which
weighs up to 160 lbs (73kg) depending on the model.
When the chassis is at full extension, the flat springs are located
approximately one (1) inch behind the front EIA RETMA rails. Access the
springs with a flat blade screwdriver or similar device to release from lock-
out or to remove the chassis from the rack.
The slides can be mounted to the chassis with this spring oriented on the
top or the bottom of the slide.
M550129-01 Rev A
Installation
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sga seriesSorensen sga seriesAmrel sps-a series

Table of Contents