Volkswagen Jetta 2005 Workshop Manual page 295

Electrical system
Hide thumbs Also See for Jetta 2005:
Table of Contents

Advertisement

– Move locking bar -1- of the relay carrier connectors on onboard
supply control unit, on left of dash panel in
-direction of arrow A-.
– Move locking bar -2- of the connectors of the on onboard sup‐
ply control unit -J519- in -direction of arrow B-.
Note
The connectors of the onboard supply control unit -J519- and the
relay carrier on onboard supply control unit, on left of dash panel
may only be pulled off if the locking bar is set to position "OPEN".
– Remove all connectors of the onboard supply control unit -
J519- and the relay carrier on onboard supply control unit, on
left of dash panel.
Note
The connector number depends on vehicle equipment.
– Unclip onboard supply control unit -J519- and relay carrier on
onboard supply control unit, on left of dash panel out of the
locking device -arrows C-.
– Pull onboard supply control unit -J519- and relay carrier on
onboard supply control unit, on left of dash panel downwards
and in opposite direction of travel out of the bracket.
Installing:
Installation is performed in the reverse order of installation; when
doing this, note the following:
Note
The locking bars may only be set to "CLOSE" when all connectors
are fitted "correctly".
Jetta 2005 ➤ , Bora 2006 ➤
Electrical System - Edition 05.2005
3. Removing and installing relay carrier
287

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bora 2006

Table of Contents