Installation Procedure - Omron ZFV Series User Manual

Smart sensors with ultra-high-speed ccd cameras
Hide thumbs Also See for ZFV Series:
Table of Contents

Advertisement

Section 2
Amplifier Unit

Installation procedure

1.
Hook the connector end of the Amplifier Unit
onto the DIN track.
2.
Push the Amplifier Unit down onto the DIN
track until the hook on the I/O cable side is
locked.
Push down until you hear it snap into place.
Always hook the connector end of the Amplifier Unit on the DIN track first. Hooking the I/O cable
end on the DIN track first may impair the mounting strength of the DIN track attachment.
Removal procedure
The following describes how to remove the Amplifier Unit from the DIN track.
1.
Pull the hook on the I/O cable end of the
Amplifier Unit downwards.
2.
Lift up the Amplifier Unit from the I/O cable
end, and remove it from the DIN track.
ZFV
24
User's Manual
Hook on connector
end
Hook on I/O cable
Hook on I/O cable

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zfv-a10Zfv-a15Zfv-a20Zfv-a25

Table of Contents