Table 3. User Settings (continued)
Description
X-Slot Signal Input Activation Delay
Input signal delayed shutdown delay
Site Wiring Fault Notice
Reset Custom Event Settings
Auto Output Configuration

Initial Startup

Startup and operational checks must be performed by an authorized
Eaton Customer Service Engineer, or the warranty terms as specified in
the Powerware 9355 UPS (10/15 kVA) User's Guide become void. This
service is offered as part of the sales contract for the UPS. Contact
service in advance (usually a two-week notice is required) to reserve a
preferred startup date.
46
EATON Powerware
Available Settings
0 through 65 seconds
1 through 65535 seconds
Enabled/Disabled
0 through 32
Enabled/Disabled
®
9355 Parallel UPS (10/15 kVA) User's Guide
Default Setting
5s
120s
Enabled
Total: 0/32
Enabled for initial startup
Disabled after initial startup
S
164201601 Rev A www.powerware.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Powerware 9355 Parallel and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Powerware 9355

Table of Contents