Installation, Relocation, Storage and Connection

Disconnect the power cord(s) before installing or removing the equipment.
Be sure to power off the equipment and unplug its power cords from the wall
outlet before installation/relocation. All voltage is removed only when the power
cords are unplugged.
Never attempt to lift the CPU module only by yourself.
The CPU module weighs about 21 kg (depending on its hardware
configuration). Carrying the CPU module only by yourself may strain your back.
Hold the CPU module firmly by its bottom with another person to carry it. The
PCI module and the expansion module weigh about 14 kg each (depending on
their hardware configuration). Hold the module firmly by its bottom.
Do not remove and carry the equipment with modules mounted.
When detaching and moving the equipment from the rack, remove all mounted
modules from NEC Express5800/ft series and carry them separately.
Do not install the equipment in an unsuitable place.
Install the equipment in such a place as specified in this User's Guide. Avoid
the following, or there is a risk of a fire.
Be careful not to hurt your fingers.
Exercise great care not to hurt your fingers on the rail when you
mount/dismount the equipment into/from the rack.
a dusty place
a humid place located near a boiler, etc
a place exposed to direct sunlight
an unstable place