The upper display in Figure 7-10 shows that phase 2
(INPUT B) follows phase 1 (INPUT A). The lower display
shows that phase 3 follows phase 1.
Figure 7-10 Phase Measurements
: Vrms AC (METER)
The Volt RMS readout (about 230 Vrms) appears on the
display. (see Figure 7-11.)
Figure 7-11 AC Volt RMS Measurement