7.4 VIOM internal operations on blade servers
Standard configuration before activating VIOM management
Figure 75: Standard configuration of the IBP 10/6 before activation
In this configuration, all server blades are linked with the standard uplink
set. The six uplink ports together form a LAG.
ServerView Virtual-IO Manager
263
Need help?
Do you have a question about the ServerView Virtual-IO Manager V3.1 and is the answer not in the manual?
Questions and answers