RJ45
Pin
1
2
4
5
6
8
Completing the Installation
Completion of the DFE module installation depends upon the type of system in which the
module is being installed.
•
If installing in a new DFE module system, refer to "Completing the Installation" on
page 3‐29.
•
If installing in an established, operating DFE module system, refer to "Completing the
Installation of a DFE‐Gold Module in an Existing System" on page 3‐31.
Completing the Installation of a New System
In a new system of DFE modules, one of the installed DFE modules will become the
management module on chassis power up, and all DFE modules will automatically be set
to the factory default values. A complete list of the factory default values are provided in
Chapter 3 of the Matrix DFE‐Gold Series Configuration Guide.
After installing all DFE‐Gold modules into the host chassis and making the connections to
the network, proceed to the following First‐Time Log‐In Using a Console Port Connection
procedure to access the module management startup screen from your PC, terminal, or
modem connection.
Modem Port Adapter Wiring and Signal Diagram
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Completing the Installation
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator
Matrix DFE-Gold Series Installation Guide 3-29
Need help?
Do you have a question about the Enterasys Gold Distributed Forwarding Engine 4G4282-49 and is the answer not in the manual?
Questions and answers