Memory Locations and Replacement Procedures
Figure B-3
1 DRAM SIMM
DRAM SIMM Replacement Procedure
Removing the DRAM SIMM
To remove the DRAM SIMM, proceed as follows:
1.
If an network expansion module is installed on the main board of the 4G4282‐49, refer
to Figure
a.
b. Lift the network expansion module straight up and off the two module
B-4 Mode Switch Bank Settings and Optional Installations
Memory Module Locations on the 4G4282-49
Note: To replace the DRAM SIMM on the 4G4282-49, you must remove the network
expansion module if one is installed.
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive
electronic equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones
de seguridad para evitar descargas de electricidad estática.
Note: Prior to removing the DRAM SIMM from a 4G4282-49, you must remove the
network expansion module to gain access to the DIMM memory and connector.
B‐4 on page B‐5 and proceed to step 1a. Otherwise proceed to step 2.
Remove and save the three screws attaching the network expansion module to
the front panel and to the standoff on the main PC board.
connectors on the main PC board.
2 DIMM
Â
Á
À
3 Main PC board
Need help?
Do you have a question about the Enterasys Gold Distributed Forwarding Engine 4G4282-49 and is the answer not in the manual?
Questions and answers