IBM 88743BU - System x3950 E User Manual page 369

Planning, installing, and managing
Table of Contents

Advertisement

• debug (logging of the Microsoft Windows installation program
messages)
• log=logfile (creates logfile)
• verbose (detailed logging)
6. Restart the operating system after the installation is completed.
Implementation of Level-1 systems in IBM Director
After the IBM Director Core Services are installed and an automatic or manual
Discovery is performed, the IBM Director detects the systems.
After IBM Director detects the system, that system is listed under Groups as:
Level1: IBM Director Core Services Systems
To unlock the system, right-click the system name, select Request Access, and
provide your operating system logon credentials. See Figure 6-32. The lock
disappears and the system can now be managed from IBM Director Console.
Figure 6-32 IBM Director: requesting access to the discovered system
Chapter 6. Management
351

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3950 m2

Table of Contents