IBM 88743BU - System x3950 E User Manual page 152

Planning, installing, and managing
Table of Contents

Advertisement

11.Route the iTBBU cable through the cable routing guides on the divider to the
DIMM.
12.Insert the battery pack harness at the end of the cable into the J1 connector
on the backside of the DIMM. See Figure 3-23.
Figure 3-23 Installing the ServeRAID-MR10k
13.Reinstall the server cover and reconnect the power cords.
14.Turn on the power: first to the enclosure (if one is connected), then to the
system.
15.Check that the ServeRAID MR10k controller is initialized correctly during
POST. The text in Example 3-7 appears.
Example 3-7 ServeRAID-MR10k initialization in POST
LSI MegaRAID SAS-MFI BIOS
Version NT16 (Build Nov 20, 2007)
Copyright(c) 2007 LSI Corporation
134
Planning, Installing, and Managing the IBM System x3950 M2
Battery
Cable
guide
Battery
cable
connector
RAID
controller
Battery
cable
Cable
guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x3950 m2

Table of Contents