Chapter 6 Cabling The Line Ports And Completing The Installation; Connecting The Line Ports To The Network; Cabling Diagrams - Cisco SFE2000P Installation And Configuration Manual

Configuration guide
Hide thumbs Also See for SFE2000P:
Table of Contents

Advertisement

Cabling the Line Ports and Completing the
Installation
This chapter provides instructions for cabling the Gigabit Ethernet ports for both one and two SCE 2000
topologies, and for configuring Gigabit Ethernet (GBE) interface parameters. In a topology utilizing two
SCE 2000 s (cascade), this includes the cascade ports as well as the line ports.
When installing a cascaded system, it is extremely important to follow the sequence of procedures
Note
outlined in the section
When installing an External Optical Bypass module, the SCE 2000 line ports are connected to the
Note
module. Refer to

Connecting the line ports to the network

Cabling Diagrams

Before beginning, find the appropriate cabling diagram for the topology in your installation:
OL-7824-06
How to Install a Cascaded
How to Cable the External Optical Bypass Module
Connecting the line ports to the network
Information About Cascaded Systems
How to Load and Activate a Service Control Application
Cabling Diagrams
How to Configure the GBE Interface Parameters
How to Cable the GBE Line Interface Ports
Testing Connectivity: Examining Link LEDs and Counters to Verify that the Network Traffic is
Reaching the Device
What to Do Next
Single SCE 2000 topologies
Single Link: Inline Topology
C H A P T E R
System.
for complete instructions.
Cisco SCE 2000 4xGBE Installation and Configuration Guide
6
6-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sge2000Slm2024t-naSce 2000 4xgbe

Table of Contents