Connecting The Management Interface; How To Cable The Management Port - Cisco SFE2000P Installation And Configuration Manual

Configuration guide
Hide thumbs Also See for SFE2000P:
Table of Contents

Advertisement

Chapter 5
Connecting the Management Interfaces and Performing Initial System Configuration
Although not demonstrated in this example, it is recommended that you always view the configuration
before applying it.
Data collection for the system configuration is completed.
Would you like to view the new configuration before it is applied? [yes/no]:
Apply and Save this configuration? [yes/no]: y(New configuration would be displayed here)
The running configuration would be overwritten by the changes you have just entered, are
you sure? [yes/no]:yThe new running configuration will be saved to the startup
configuration.
Do you want to save a copy of the startup configuration file in a remote station?
[no]:yEnter a full FTP path of the remote destination:
ftp://vk:vk@10.1.1.253/h:/copyofstartup.txtCommitting configuration...
Configuration completed successfully.
Saving configuration...
Writing general configuration file to temporary location...
Backing-up general configuration file...
Copy temporary file to final location...
Done!
EXAMPLE 3:
Following is an example of a configuration that was aborted, although no errors were detected.
Data collection for the system configuration is completed.
Would you like to view the new configuration before it is applied? [yes/no]:
Apply and Save this configuration? [yes/no]: nThe changes you have just entered would be
discarded, are you sure? [yes/no]:ySetup procedure aborted, no configuration changes made.

Connecting the Management Interface

The SCE platform is equipped with two RJ-45 management (MNG) ports. These ports provide access
from a remote management console to the SCE platform via a LAN. The two management ports provide
the possibility for a redundant management interface, thus ensuring management access to the SCE
platform even if there is a failure in one of the management links.
If only one management port is used, the desired port is simply connected directly to the LAN. If both
management ports are used, they must both be connected to the management console via a switch. In this
way, the IP address of the MNG port is always the same, regardless of which physical port is currently
active.
The procedures for cabling the management port and testing connectivity between the SCE 2000 and the
remote management host are explained in the following sections:

How to Cable the Management Port

The SCE 2000 has two management ports, labeled Mng1 and Mng 2.
SUMMARY STEPS
1.
2.
OL-7824-06
How to Cable the Management Port
How to Verify Management Interface Connectivity
Take the Ethernet cable provided (with attached RJ-45 connector) and plug it into the desired MNG
port on the front panel of the SCE 2000 , as shown in the following figure.
Connect the other end of the Ethernet cable into your management network.
Connecting the Management Interface
Cisco SCE 2000 4xGBE Installation and Configuration Guide
5-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sge2000Slm2024t-naSce 2000 4xgbe

Table of Contents