Lucent Technologies CentreVu Release 3 Version 8 High Availability Connectivity, Upgrade and Administration User Manual page 110

Call management system release 3 version 8 high availability connectivity
Table of Contents

Advertisement

Administering the Switch for CMS High Availability Systems
Administering the Definity Switch
Adding IP Routing
add ip-route 1
Route Number: 1
Destination Node: 3net
C-LAN Board: 01C02
Route Type: Network
Use the IP Routing form to set up the IP route(s) from the switch to the
4
CMS computer. This is required when:
• the switch and the CMS computer are on different subnets, or
• when a Gateway Address is not administered for the C-LAN IP
interface.
Note:
LAN configurations that require IP routing are not recommended for
use with the HA option.
The following example shows an IP route. This route shows how you get
from a gateway (for example, a router) to a network.
Gateway: gateway2
Metric: 0
CentreVu CMS R3V8 High Availability
Connectivity, Upgrade and Administration
IP ROUTING
Page
1 of
1
4-16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CentreVu Release 3 Version 8 High Availability Connectivity, Upgrade and Administration and is the answer not in the manual?

This manual is also suitable for:

Centrevu

Table of Contents