Installing The Dc Director In The 14U Rack Mount Kit; Rack Mount Kit Parts List; Items Supplied With The 14U Rack Mount Kit (Dc Director) - HP A7990A - StorageWorks SAN Director 4/16 Blade Switch Hardware Reference Manual

Hp storageworks dc san backbone director hardware reference guide (5697-7346, september 2008)
Table of Contents

Advertisement

Installing the DC Director in the 14U Rack Mount Kit

Allow approximately one hour to unpack and install your DC Director using the 14U Rack Mount Kit
supplied with your unit. Obtain the following tools:
Torque wrench with #2 Phillips screwdriver tip
Flathead screwdriver
Hydraulic or assisted lift with a minimum raise of 55 in. (140 cm) and a minimum capacity of 250 lbs
(1 13 kg).
CAUTION:
A fully populated DC Director (eight FC8-48 port cards, 384 ports) weighs approximately
104 kg (228 lbs) and requires a hydraulic or assisted lift to install it.
14U Rack Mount Kit
Table 7
and
Figure 3
Director.
Table 7

Items supplied with the 14U rack mount kit (DC Director)

Item
Description
For all types of installations
A
Left rack mount shelf bracket (rail brackets may differ from the illustration)
B
Right rack mount shelf bracket (rail brackets may differ from the illustration)
C
10-32 x 5/8 inch (1.58 cm) panhead Phillips screw, washer (torque to 32 in.-lbs, 37
cm-kgs)
For cabinets that have rails with round holes
D
10-32 clip nut
E
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw, with lock washer (torque to 80
in.-lbs, 92 cm-kgs)
For cabinets that have rails with square holes
F
10-32 retainer nut
G
1/4-20 x 1/2 in. (1.27 cm) panhead Phillips screw, with glue (torque to 80 in.-lbs, 92
cm-kgs)
H
0.375 in. (0.953 cm) alignment washer
26
Installation
parts list
identify the hardware provided in the 4U rack mount kit that ships with your DC
Quantity
1
1
6
6
16
6
16
16

Advertisement

Table of Contents
loading

Table of Contents