In the CLI session, type continue to indicate that the replacement has been completed.
5.
Please enter the word `continue' after the new WWN card has been installed:
continue
Restoring the information to the replacement FRU now, please wait about 20 seconds
to complete
Verifying the replacement FRU now...
WWN card hot swap is now complete.
FRU replacement completed successfully!
6.
Verify that the WWN card is correctly connected by checking the LEDs on the WWN card to see if
they reflect the status of the components.
NOTE:
7.
Pack the faulty WWN card in the packaging provided with the new card and return it to the DC
Director supplier.

SFPs and XFPs

To remove an SFP or XFP (FC10-6 blade only) transceiver, pull the bale down and out, sliding the
transceiver out of the Director blade.
To install an SFP or XFP, position one of the transceivers so that the key is oriented correctly to the port.
Insert the transceiver into the port until it is firmly seated and the latching mechanism clicks. Transceivers
are keyed so that they can only be inserted with the correct orientation. If a transceiver does not slide in
easily, ensure that it is correctly oriented.
The DC Director comes with a transceiver extraction tool (see
remove transceivers from blades where the space is limited. To use the extraction tool, slide the tool on to
the bale of the transceiver and pull it out.
Figure 35

Optical transceiver (SFP and XFP) extraction tool

The LEDs might take up to 2 minutes after WWN card installation to begin functioning.
Figure
35). The extraction tool is designed to
DC SAN Backbone Director hardware reference guide