5.
Use a lift to raise the chassis to the correct level. If installing the chassis in a cabinet, follow the
instructions provided by the rack kit manufacturer.

Install components into new chassis

Replace the field replaceable units (FRUs) into the chassis.
CAUTION:
Wear a grounded ESD strap when handling DC Director components and port blades. The Director
chassis provides a grounding connection above the power connectors. Also,
antistatic packaging.
1.
Replace the WWN bezel (logo plate) and WWN cards (see
and WWN
2.
Replace the blower assemblies (see
3.
Replace the power supplies or filler panels (see
4.
Replace the control processor blades (CP8) (see
page 73).
5.
Replace the core switch blades (CR8) (see
6.
Replace the port blades or filler panels (see
7.
Replace the cable management comb (see
8.
Connect the power cords to the power supplies and the power outlets.
9.
Power-on the DC Director.
10.
The DC Director performs a power-on self-test (POST). The POST takes a minimum of three minutes and
is complete when LED activity returns to standard state.
1 1.
Verify that the DC Director is powered on and POST is complete (all power LED indicators on the port,
control processor, and core switch blades should be a steady green).
12.
Verify that all components are functioning correctly by checking their LEDs. If the LEDs do not indicate
correct operation, try reinstalling the corresponding component.

Configure new chassis serial number

To configure a new chassis serial number:
1.
Open a CLI session (Telnet or serial) to the DC Director and log in as root:
The root and factory account disclaimer displays.
• Log in using Telnet.
92
Installing Field-replaceable units (FRUs)
card" on page 84).
"Replacing a blower
store ESD-sensitive components in
"Replacing the WWN bezel (logo plate)
assembly" on page 80).
"Replacing a power
"Replacing a control processor blade
"Replacing a core switch blade
"Replacing a Director
blade" on page 68).
"Replacing a cable management
supply" on page 79).
(CP8)" on
(CR8)" on page 78).
comb" on page 65).

Advertisement

Table of Contents
loading

Table of Contents