Verifying Installation
During router installation, you must verify installation each time you power on the router, making sure
that:
Whether there is enough space around the router for heat-dissipation, and whether the workbench
is stable enough.
Whether the power supply that the power cord connects to is compliant with that required by the
router.
Whether the PGND wire of the router is correctly connected.
Whether the router is correctly connected to other devices, such as the console terminal.
The check after installation is very important. The stability, grounding of the router and power supply will
directly affect the operation of the router.
3-17
Need help?
Do you have a question about the H3C MSR 30-20 ROUTER and is the answer not in the manual?
Questions and answers