Installation and operating manual
7.2 First time putting the product into operation
Before the first time the product is put into operation, the following prerequisites must be fulfilled and the
preparatory tasks must have been completed.
Tools
•
No tool necessary
1.
The product's installation must have been completed.
Figure
Prerequisites
Material
•
No material necessary
Preparation work
Commissioning work
Description / explanation
1. Remove the cover from the pressure relief
chamber and remove the activated carbon mat
from the vent of the pressure relief chamber.
2. Fill the pressure relief chamber with tap water
via the vent.
0 Stop filling it as soon as water comes out
3. Insert the activated carbon mat into the vent of
the pressure relief chamber and place the cover
on the pressure relief chamber.
Protective equipment
To be worn at all times:
from the condensate outlet.
QWIK-PURE
CS
®
37 | 68