Installation and operating manual
Figure
Installation work
Description / explanation
9. Place the pressure relief chamber on the foot.
0 Align the connection in the direction of the
clean water tank.
10. Install the riser duct between the collector and
the clean water tank.
0 Place the riser duct's straight fitting on the 
connection in the collector and tighten it
clockwise by hand.
0 Place the riser duct's elbow fitting on the 
connection of the clean water tank and
tighten it clockwise by hand.
QWIK-PURE
CS
®
31 | 68